Nobody books one of these out of curiosity. It is an insurer, a lender or a home inspector, and there is usually a date attached.

Almost nobody wakes up curious about their wiring. Something prompted the call — an insurer at renewal, a lender before closing, or a home inspector who wrote "recommend evaluation by a licensed electrical contractor" and left it at that.
Three requests, three different documents

Most of this work comes from one of three things: a fuse panel, suspected knob-and-tube or aluminium branch wiring, or an unpermitted alteration found during a sale.
Each of them needs a different piece of paper. Asking for the wrong one is the most common reason somebody misses their deadline and then pays for the whole thing twice.
An electrical safety inspection is not a certificate
This one trips people up constantly, so plainly: a contractor’s written assessment of your wiring and an Electrical Safety Authority Certificate of Acceptance are two different documents.
Insurers usually want the first. Lenders and municipalities frequently want the second — and the second only exists where the work was filed and inspected at the time it was done.
What if the previous owner never filed anything
Then no report written today can conjure that record into existence, and anybody promising otherwise is selling you a disappointment.
The honest route is a notification covering the remediation. It is a far better conversation to have before a sale than during one, which is the argument for booking the inspection early rather than the week the offer lands.
What we will tell you not to spend money on
Two-prong outlets in a house that does have a grounding conductor can often be sorted with ground-fault protection and correct labelling rather than a rewire.
And a panel that is merely full is not a panel that is unsafe. A subpanel is frequently the cheaper and entirely correct answer. Where either applies, the report says so — which is not much of a sales strategy, and is the only version worth paying for.
Talk to a Midland electrical contractor
Tell us three things: the town, roughly when the building went up, and what the panel looks like — fuses or breakers, and the number on the main. That is usually enough to say whether you are looking at an afternoon, a scheduled job, or a conversation with your distributor first. Often enough to price it, too, without anybody driving anywhere.