Water, metal and electricity, with its own section of the code. Most of what is on the docks around this bay predates the rule that now governs it.

This is the work that makes an electrical contractor on this shoreline different from one in a landlocked town. It is also why a page written for a city does not describe the job here at all.
It has its own section of the code, for a reason

Marine wharves, docking facilities, fixed and floating piers and boathouses are covered by Section 78 of the Ontario Electrical Safety Code, separately from everything else on your property.
The reasoning is worth saying plainly, because it is not obvious. A fault that would give you a nasty shock on dry land can be fatal in water — a swimmer inside an energised field loses muscle control before they can swim out of it, at current levels far below what it takes to hurt somebody standing on grass.
That is why this section is stricter than the rules covering the house forty metres up the slope.
Rule 78-050, which most existing docks fail
Receptacles rated 15 A and 20 A on the exterior of a boathouse, a pier, a docking facility or a wharf need ground-fault protection.
A great deal of what is installed around this bay went in before that applied. It has not been removed, it is not obvious from a boat, and it is the single most common thing we find on a first look at a shoreline property.
What usually needs doing
- A feeder run out to the dock with no disconnect within sight of it.
- Receptacles with no ground-fault protection — rule 78-050, directly.
- Bonding that stops at the shoreline, so the metal on the dock is not tied back to the system.
- Lift motors fed from whatever was nearest, frequently through a cord.
- On floating docks, a cable with no allowance for the water levels this bay actually reaches, which is a wider range than most owners plan for.
Ice is what breaks it, not water
A dock feed that was perfectly correct in September is frequently damaged by April.
Winter ice lifts and drags cribs and floating sections, and the feeder is the least flexible thing bolted to them. So checking a dock feed in spring is not an upsell around here. It is the same conversation every year — and the properties where it gets skipped are the ones where a fault turns up in July with people in the water.
Talk to a Midland electrical contractor
Tell us three things: the town, roughly when the building went up, and what the panel looks like — fuses or breakers, and the number on the main. That is usually enough to say whether you are looking at an afternoon, a scheduled job, or a conversation with your distributor first. Often enough to price it, too, without anybody driving anywhere.